Rain&Sewage Diversion Rain&Sewage Diversion

Rain&Sewage Diversion

Separate rainwater and sewage flow without external power, low-carbon and energy-saving.

Plan ideas
700*549

Effectively diverting the dry season and initial rainwater to sewage pipelines.

After being treated, the rainfall overflows into the rainwater pipe network or discharge into the river.

After rainfall, the intercepted pollutants are discharged into the sewage pipeline and transported to the sewage treatment plant.

Prevent early rainwater and sewage with high pollution levels from entering natural water bodies and ensure overflow safety.

Process characteristics

1. Installed in existing or newly constructed rainwater inspection wells.

2. Use the water level changes in the pipeline network and equipment well chamber to achieve equipment opening and closing.

3. No need for power connection, easy installation, operation and maintenance .

4. Sediments, floating debris, and other pollutants in rainwater are intercepted in the rainwater diversion well through pollution removal equipment such as HydroBoard B and HydroBoard F-I.

5. Can add a check design to avoid situations such as sewage back flow.

700*482
Applicable scenarios
1158*770
The initial rainwater interception of the separate drainage system
1158*770
The connection between the combined drainage system and the municipal pipeline network
1158*770
Rainwater and sewage diversion of combined drainage systems
1158*770
Rainwater and sewage diversion and interception in dry season without power connection conditions
corollary equipment