Sakura Garden Pump Station and Interception Well Project
Project Time

2021-2022

Project Content

The current situation is a combined sewer. On sunny days, domestic sewage overflows into the river through the outfalls, and on rainy days, mixed rainwater and sewage overflows into the sea, causing water pollution. The goal of this project is to prevent sewage from flowing into the river on sunny days and reduce sewage from flowing into the river on rainy days. Recently, an intelligent interception well will be used to separate and collect mixed water, and transfer it to the Yinghuayuan pump station for lifting. One intelligent interception well and related supporting pipelines will be constructed.

Technical Proposal

The intelligent interception system is adopted. In unmanned situations, the intelligent interception control system can achieve remote monitoring, information integration, automatic control, and intelligent interception. It can effectively solve the problem of municipal rainwater and sewage entering the river.