Newly built sewage treatment plant in Dongxinkai River
Project Time

2020-2021

Project Content

This project started in 2016 and focused on flood control, water ecological maintenance, and water ecological governance engineering. The designed scale of the sewage treatment plant is 50000 m3/d. After completion, it will greatly improve the surrounding water environment, play a very important role in controlling water pollution, keeping the water quality and ecological balance of the local watershed. The supporting initial rainwater storage tank is an important component of the newly constructed sewage treatment plant.

Technical Proposal

The gate type automatic flushing system is adopted. In the absence of anyone on duty, the gate type automatic flushing system can achieve remote monitoring, information integration, automatic flushing, autonomous circulation work, etc. It can effectively flush sediment from the floor of the storage tank into the collection corridor, achieving the effect of cleaning the storage tank.

8长春伊通河1.jpg