2020-2021
This project is located on the west side of Xidi East Road in Xiamen City, south of the parking lot of Haiwan Park. The main construction content on the east side of the current sewage treatment plant is to build a new 25000 m3 water storage tank with related pumping room; a transmission pumping room with a civil engineering scale of 100000 m3/d to the Haitian pumping station. The main purpose of this project is to reduce peak load and fill valley load in the sewage treatment plant, explore load capacity, and achieve interconnection and interoperability of the western area of the island's sewage system.
The gate type automatic flushing system is adopted. In the absence of anyone on duty, the gate type automatic flushing system can achieve remote monitoring, information integration, automatic flushing, autonomous circulation, etc. It can effectively flush sediment from the bottom of the tank into the collection canal, achieving the effect of cleaning the tank body.