Shanghai Zhanghuabang East Drainage System Project
Project Time

2020-2021

Project Content

The Zhanghuabang East Drainage System in Baoshan District is located in the northeast of Shanghai city, adjacent to the Huangpu River to the east and Yangpu District to the south, with a service area of approximately 287.65 hectares. A new rainwater pump station, sewage pumping station, initial rainwater storage tank, and related ancillary facilities are constructed. New rain and sewage pipelines by northside of Jungong Road, Ruiji Road rain and sewage pipelines, Guojiang Road rain and sewage pipelines will be built. To solve the problem of regional sewage treatment, a new pumping station will be built with a sewage pressure outlet pipe and connect to those built by the first phase of the confluence project.

Technical Proposal

The gate type automatic flushing system is adopted. In the absence of anyone on duty, the gate type automatic flushing system can achieve remote monitoring, information integration, automatic flushing, autonomous circulation work, etc. It can effectively flush sediment from the bottom of the storage tank into the collection canal, achieving the effect of cleaning the storage tank.

26张华浜_副本.jpg